NARC
About
Browse
Create
Inspect
Numbers
Login
Edit Puzzle
Puzzle ID
↻
Title
Sequence Length
5
Difficulty
--
Easy
Medium
Hard
Color
Grid Sequence
Narrative
The building was designed to be constructed from the foundation up, one floor per month. The architect specified that the top floor — the observation deck — should be the last built and the first demolished in any retrofit, since it bore no structural load. When the retrofit came, the contractors followed the spec: the top floor was removed while the rest of the building continued to operate. The replacement floor was installed the following quarter.
0
characters
Narrative Variants
+ Add Variant
No additional variants. The main narrative is saved as "original".
Your Info
(optional)
Name
Email
Submit for Review
Preview
Clear All
Preview (as solver sees it)
Reveal Narrative
Submit this puzzle?
Submitted!