NARC
About
Browse
Create
Inspect
Login
Edit Puzzle
Puzzle ID
Title
Sequence Length
5
Difficulty
--
Easy
Medium
Hard
Color
Grid Sequence
Narrative
The building was designed to be constructed from the foundation up, one floor per month. The architect specified that the top floor — the observation deck — should be the last built and the first demolished in any retrofit, since it bore no structural load. When the retrofit came, the contractors followed the spec: the top floor was removed while the rest of the building continued to operate. The replacement floor was installed the following quarter.
0
characters
Narrative Variants
+ Add Variant
No additional variants. The main narrative is saved as "original".
Your Info
(optional)
Name
Email
Submit for Review
Preview
Clear All
Preview (as solver sees it)
Reveal Narrative