The building was designed to be constructed from the foundation up, one floor per month. The architect specified that the top floor — the observation deck — should be the last built and the first demolished in any retrofit, since it bore no structural load. When the retrofit came, the contractors followed the spec: the top floor was removed while the rest of the building continued to operate. The replacement floor was installed the following quarter.